Project Profile
Pan American Water Plant, North Port, Florida
SUMMARY
United Mechanical recently completed a project at a Water Plant in North Port, Florida. The facility faced serious issues with its existing Automatic Transfer Switching (ATS) system for the standby generator.
United Mechanical was engaged to replace a 1600 Amp ATS while minimizing disruption to the plant’s daily operations. Confident in the skill and dedication of our Electrical team, we accepted without hesitation. Our team coordinated a Florida Power and Light shutdown to safely de-energize the equipment, allowing our team to complete the installation safely and efficiently.

After installation, power was reconnected, and a series of thorough tests confirmed that the new ATS was performing exactly as expected. Thanks to the hard work and professionalism of our Team Members, the water plant is now back up and running with a reliable, fully operational 1600 Amp ATS.
United Mechanical is proud to deliver solutions that keep critical infrastructure running smoothly. Click here to learn more about how our team can provide emergency power solutions to your facility.

PROJECT DETAILS
Electrical Contractor
United Mechanical
A Fidelity Company
Client
Pan American Water Plant
Industry
Government
Category
Emergency Power Solutions
Client Quote
Dale Beckmann
Utilities - Maintenance Coordinator
The City of North Port, Florida
"I wanted to thank you for the incredible job you did replacing the ATS at our Wastewater Treatment Plant. Your attention to detail in the planning phase took all our risks and concerns into account. You met our switchover times with no impact to our operations. You executed flawlessly, did a professional job, and completed the work one full day ahead of schedule. Thanks to you, Tony, Curt, and the rest of the team for making this difficult project look easy. You certainly exceeded our expectations."