UNITED MECHANICAL PROJECT PROFILE
Pan American Water Plant, North Port, Florida
United Mechanical recently completed a project at a Water Plant in North Port Florida. The facility faced serious issues with its existing Automatic Transfer Switching (ATS) system for the standby generator.
United Mechanical was engaged to replace a 1600 Amp ATS while minimizing disruption to the plant’s daily operations. Confident in the skill and dedication of our Electrical team, we accepted without hesitation. Our team coordinated a Florida Power and Light shutdown to safely de-energize the equipment, allowing our team to complete the installation safely and efficiently.
UNITED MECHANICAL CASE STUDY
Cypress Cove Equipment Replacement & Optimization
Cypress Cove, an assisted living facility providing innovative senior living solutions for older adults in Fort Myers, Florida, reached out to United Mechanical, a leading full-service HVAC/mechanical and Building Automation Systems (BAS) contractor, to replace the cooling towers at the facility’s Central Energy Plant.
The existing cooling towers within Cypress Cove's Central Energy Plant provides cooling for the entire 48-acre campus and needed replacement to reduce energy consumption and increase system reliability.
UNITED MECHANICAL CASE STUDY
Cayo Costa Off-Grid Solar System & Generator Installation
Cayo Costa, Florida is an idyllic island off the Gulf of Mexico, but the region’s climate can strain a property’s electrical system.
By partnering with United Mechanical (UM) – a Fidelity Building Services Group (Fidelity) company – one property owner was able to meet his goals of off-grid reliability that would improve the home’s energy costs and indoor air quality (IAQ), as well as make living in paradise a sustainable reality.