top of page
United-Mechanical-About-Section-Header-1_1920x1080.jpg

Our Work

UNITED MECHANICAL PROJECT PROFILE

Pan American Water Plant, North Port, Florida

Water_2.jpg

United Mechanical recently completed a project at a Water Plant in North Port Florida. The facility faced serious issues with its existing Automatic Transfer Switch (ATS) system for their standby generator.

 

United Mechanical was engaged to replace a 1600 Amp ATS while minimizing disruption to the plant’s daily operations. Confident in the skill and dedication of our Electrical team, we accepted without hesitation. Our team coordinated a Florida Power and Light shutdown to safely de-energize the equipment, allowing our team to complete the installation safely and efficiently.

UNITED MECHANICAL CASE STUDY

Cypress Cove Equipment Replacement & Optimization

Cypress Cove, an assisted living facility providing innovative senior living solutions for older adults in Fort Myers, Florida, reached out to United Mechanical, a leading full-service HVAC/mechanical and Building Automation Systems (BAS) contractor, to replace the cooling towers at the facility’s Central Energy Plant.

​

The existing cooling towers within Cypress Cove's Central Energy Plant provides cooling for the entire 48-acre campus and needed replacement to reduce energy consumption and increase system reliability.

UNITED MECHANICAL CASE STUDY

Cayo Costa Off-Grid Solar System & Generator Installation

UM-Cayo-Costa-Website-Strip_2700x1800.png

Cayo Costa, Florida is an idyllic island off the Gulf of Mexico, but the region’s climate can strain a property’s electrical system.
 

By partnering with United Mechanical (UM) – a Fidelity Building Services Group (Fidelity) company – one property owner was able to meet his goals of off-grid reliability that would improve the home’s energy costs and indoor air quality (IAQ), as well as make living in paradise a sustainable reality.​

bottom of page